SOLIDVOLTEV Charger Installation

Miami-Dade County

Tesla & EV charger installation across Miami-Dade County

From high-rise-adjacent townhomes in Brickell to single-story ranch houses in Kendall and Homestead, Miami-Dade homes vary a lot in how their power gets to the garage. We look at your panel and your parking spot first, then quote a flat range — no hourly surprises.

Where we install in Miami-Dade

  • Miami
  • Coral Gables
  • Doral
  • Kendall
  • Hialeah
  • Homestead
  • Miami Beach
  • Pinecrest
  • Cutler Bay
  • Aventura

Not listed? We cover all of Miami-Dade County — call and ask.

What's different about Miami-Dade homes

Older panels are common

Plenty of Miami-Dade houses still run on panels installed decades ago with every slot used. We check your main breaker size and open slots from your photos before install day, so if a panel change is needed you hear it in the quote, not halfway through the job.

Carport and open-driveway parking

Many homes here park under a carport or on an open driveway rather than in an enclosed garage. Those spots need weather-rated fittings and sometimes a short trench, which is exactly what our placement tool prices for you.

Permits and inspection

Electrical work is permitted through your city or county building department and inspected when it's done. We pull the permit and meet the inspector — you don't have to take a day off for it.

Permitted, licensed, and priced up front

Every Miami-Dade install includes the permit, the load check, the dedicated breaker, the wire run, mounting, testing and inspection sign-off. Price ranges start at $750. See every step of the install or look through finished jobs.

Miami-Dade questions we get asked

How much does an EV charger install cost in Miami-Dade?
Most Miami-Dade installs land between $750 and $2,750. The price is driven mainly by how far your charger sits from the electrical panel and whether the wire runs through an attic, along a wall, or underground.
Do you install Tesla Wall Connectors?
Yes — Tesla Wall Connector installs are our specialty, and we also install standard J1772 Level 2 chargers for other EVs.
Is a permit really required?
Yes. A Level 2 charger is a dedicated high-draw circuit, so it needs a permit and an inspection. Permitted work keeps your insurance and warranty intact and shows up as a documented upgrade if you sell.
How long does it take?
Most installs are about half a day on site. Counting permitting and inspection sign-off, plan on roughly one to two weeks end to end.

Other areas we serve

Ready for your Miami-Dade price?